Essential Pre-Commissioning Steps for Seamless Sunny Boy Smart Energy Inverter Installation

Diana Lamadoraby Diana Lamadora (guest post), , 0 Comments

To ensure a smooth and efficient commissioning process for the Sunny Boy Smart Energy hybrid inverter, we recommend reviewing the following steps before heading to the job site. By taking these steps in advance, you’ll save time and avoid potential issues during commissioning. Having the latest firmware ensures smooth operation and prevents potential issues during the commissioning process. Equally important is downloading the correct SMA 360° app, which will be your go-to tool for commissioning, monitoring and troubleshooting the system.

In this blog, we’ll cover the essential steps to help you avoid on site delays, helping ensure you’re as prepared as possible. If further assistance is still needed, you can request a scheduled call back from the SMA service team.  

Step 1: Download and Verify the SMA 360° App: 

Make sure you have the SMA 360° app installed, available for both iOS and Android devices. To confirm you have the most up-to-date version, visit the App Store for iOS devices or the Google Play Store for Android devices. If your app is outdated, please update it to the latest version. 

Step 2: Confirm that the Sunny Boy Smart Energy is Ready for Commissioning: 

Once the AC and DC are powered on, verify that the green and red lights on the Sunny Boy Smart Energy cover are blinking in unison—this process may take up to 10 minutes to initiate.

Step 3: Ensure Your Device Has the Latest Firmware: 

In the SMA 360° app, click on “Set up” from the main menu, then select “Manual update” to begin updating the firmware. To save time at the job site, download the latest firmware directly to your mobile device before you go. It will automatically be stored in your downloads folder, so you’re ready to commission right when you arrive.

Download the SMA 360° App from the Apple App Store

Download the SMA 360° App from the Google Play Store

Bonus Tip: Access the Latest Sunny Boy Smart Energy Firmware Online

You can also access the most up-to-date firmware by visiting the Sunny Boy Smart Energy product page. Click on “Downloads” (located at the top left of the webpage), scroll down to “Software” and download the latest firmware update. 

Ready to Continue the Commissioning Process? Follow This Detailed TechTip

Once you’ve completed these three pre-commissioning steps, you’ll be fully prepared to successfully continue the commissioning process for the Sunny Boy Smart Energy hybrid inverter. 

For a detailed, step-by-step guide to commissioning the Sunny Boy Smart Energy, please refer to the following TechTip:

TechTip: Commissioning the Sunny Boy Smart Energy (US) with the SMA 360° App

Need additional support? Request a scheduled callback

If you need further assistance or troubleshooting and would like to request a scheduled callback, please see this article for next steps. 

3/5 - (2 votes)
0 Comments
Leave a Reply
Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>