{"id":117489,"date":"2020-08-17T19:17:59","date_gmt":"2020-08-18T02:17:59","guid":{"rendered":"https:\/\/www.sma-sunny.com\/?p=117489"},"modified":"2020-12-08T16:02:18","modified_gmt":"2020-12-08T15:02:18","slug":"sma-extends-smart-connected-registration-window-to-two-years","status":"publish","type":"post","link":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/","title":{"rendered":"SMA Extends Smart Connected Registration Window to Two Years!"},"content":{"rendered":"<p><strong>In response to strong customer enrollment, SMA has extended the window for customers to enroll their <a href=\"https:\/\/www.sma-america.com\/products\/monitoring-control\/sunny-portal.html\" target=\"_blank\" rel=\"noopener noreferrer\">Sunny Portal<\/a> plants into SMA\u2019s groundbreaking FREE service support program, <a href=\"https:\/\/www.sma-america.com\/products\/monitoring-control\/sma-smart-connected.html\" target=\"_blank\" rel=\"noopener noreferrer\">Smart Connected<\/a>.<\/strong><\/p>\n<p><a href=\"https:\/\/www.sma-america.com\/products\/monitoring-control\/sma-smart-connected.html\" target=\"_blank\" rel=\"noopener noreferrer\">SMA Smart Connected<\/a> provides behind-the-scenes, proactive service troubleshooting support and the ability to proactively ship RMA units. This streamlines business operations and increases the profitability of service support activity by reducing truck rolls up to 50%.<\/p>\n<p>Enrolling in <a href=\"https:\/\/www.sma-america.com\/products\/monitoring-control\/sma-smart-connected.html\" target=\"_blank\" rel=\"noopener noreferrer\">Smart Connected<\/a> is easy for plants that have, in the last two years, registered on either the classic Sunny Portal or <a href=\"https:\/\/ennexos.sunnyportal.com\/login?next=%2F\" target=\"_blank\" rel=\"noopener noreferrer\">Sunny Portal powered by ennexOS.<\/a> For either portal, address and email information for the <em>Operator<\/em> and <em>Installer<\/em> needs to be entered, and a shipping address and notification emails selected.\u00a0 If desired, <em>Installer<\/em> information can be duplicated in the <em>Operator<\/em> fields.<\/p>\n<p>For the classic Sunny Portal, once the plant to be enrolled has been selected, choose <em>PV System Monitoring<\/em> from the main menu, then select <em>Settings<\/em>\u201d at the top right of the SMA Smart Connected section of the screen (Fig 1a). Scroll to the bottom of the Smart Connected section in the screen that appears and select <em>Edit<\/em> (Fig 1b), then Select the check box next to SMA Smart Connected (Fig 1c). Enter all required <em>Installer<\/em> and <em>Operator Data<\/em>, select a shipping address and email addresses for notifications. Click <em>Save<\/em> at the bottom right of the screen when done (Fig 1d).\u00a0 You will see confirmation that Smart Connected has been activated (Fig 1e)!<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9761 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-1.jpg\" alt=\"Smart Connected tutorial\" width=\"620\" height=\"199\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/199;\" \/><\/p>\n<p>Fig 1a. Under <em>PV System Monitoring<\/em>, select <em>Settings<\/em> for SMA Smart Connected to begin.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9762 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-2.jpg\" alt=\"SMA Smart Connected blog post\" width=\"620\" height=\"327\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/327;\" \/><\/p>\n<p>Fig 1b. Select <em>Edit<\/em> at bottom of SMA Smart Connected section.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9763 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-3.jpg\" alt=\"SMA Smart Connected\" width=\"620\" height=\"337\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/337;\" \/><\/p>\n<p>Fig 1c. Select the check box to show the <em>Installer <\/em>and <em>Operator<\/em> data fields.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9764 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-4.jpg\" alt=\"SMA Smart Connected information\" width=\"620\" height=\"326\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/326;\" \/><\/p>\n<p>Fig 1d. After filling out all information and selecting emails and address, click <em>Save<\/em>.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9765 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-5.jpg\" alt=\"Smart Connected step by step\" width=\"620\" height=\"294\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/294;\" \/><\/p>\n<p>Fig 1e. Congratulations!\u00a0 Your PV plant is now protected by SMA Smart Connected.<\/p>\n<p>For Sunny Portal powered by ennexOS, select the correct plant from your portfolio. \u00a0On the left, select the Configuration (wheel) icon, and select <em>System Monitoring<\/em> from the list in the plant column (Fig 2a). Scroll to the bottom of the window that appears. If <em>Operator<\/em> and <em>Installer<\/em> information was not entered during plant registration, select <em>Edit Operator<\/em> <em>and<\/em> <em>Installer data<\/em> (Fig 2b) and fill out all required fields (select the checkbox for No value-added tax ID available for North America), selecting <em>Save<\/em> when done (Fig 2c).\u00a0 Now select <em>Carry out initial configuration<\/em> (Fig 2d), and select the correct dispatch (shipping) address, select which emails should receive Smart Connected notifications, and most importantly, select the check box at the bottom to activate Smart Connected.\u00a0 Select <em>Save<\/em> when done to finish the enrollment (Fig 2e). A confirmation that Smart Connected is active will appear (Fig 2f).<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-117491 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SC-6.png\" alt=\"Sunny Portal screenshot\" width=\"413\" height=\"487\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 413px; --smush-placeholder-aspect-ratio: 413\/487;\" \/><\/p>\n<p>Fig 2a. In the Configuration menu for the plant, choose <em>System Monitoring<\/em>.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-117492 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SC-7.jpg\" alt=\"Sunny Portal from SMA\" width=\"930\" height=\"877\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 930px; --smush-placeholder-aspect-ratio: 930\/877;\" \/><\/p>\n<p>Fig 2b. If needed, select <em>Edit Operator and Installer data<\/em>.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-large wp-image-9768 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/08\/SC-8.jpg\" alt=\"Smart Connected tutorial\" width=\"620\" height=\"239\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 620px; --smush-placeholder-aspect-ratio: 620\/239;\" \/><\/p>\n<p>Fig 2c. Fill in all required <em>Operator<\/em> and <em>Installer<\/em> information.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-117493 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SC-9.jpg\" alt=\"Smart Connected article\" width=\"936\" height=\"874\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 936px; --smush-placeholder-aspect-ratio: 936\/874;\" \/><\/p>\n<p>Fig 2d. Select <em>Carry out initial configuration<\/em>.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-117494 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SC-9-1.jpg\" alt=\"Smart Connected setup\" width=\"936\" height=\"874\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 936px; --smush-placeholder-aspect-ratio: 936\/874;\" \/><\/p>\n<p>Fig 2e. Select the shipping address, appropriate email addresses, and select the bottom checkbox to enroll.<\/p>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-117495 lazyload\" data-src=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SC-91.jpg\" alt=\"Smart Connected configuration blog post\" width=\"1004\" height=\"687\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1004px; --smush-placeholder-aspect-ratio: 1004\/687;\" \/><\/p>\n<p>Fig 2f. Congratulations!\u00a0 Your PV plant is now protected by SMA Smart Connected.<\/p>\n<p>&nbsp;<\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;117489&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;1&quot;,&quot;greet&quot;:&quot;&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;22&quot;,&quot;title&quot;:&quot;SMA Extends Smart Connected Registration Window to Two Years!&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 1px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 22px; height: 22px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 17.6px;\">\n            <span class=\"kksr-muted\"><\/span>\n    <\/div>\n    <\/div>\n<div class='printomatic pom-default ' id='id4034'  data-print_target='article'><\/div>","protected":false},"excerpt":{"rendered":"<p>In response to strong customer enrollment, SMA has extended the window for customers to enroll their Sunny Portal plants into&#8230;<\/p>\n","protected":false},"author":100,"featured_media":117490,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1314],"tags":[1676],"class_list":["post-117489","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","tag-smart-connected"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog\" \/>\n<meta property=\"og:description\" content=\"In response to strong customer enrollment, SMA has extended the window for customers to enroll their Sunny Portal plants into...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/\" \/>\n<meta property=\"og:site_name\" content=\"Sunny. SMA Corporate Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/facebook.com\/SMASolarTechnology\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-18T02:17:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-08T15:02:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"334\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mike\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@SMAsolar\" \/>\n<meta name=\"twitter:site\" content=\"@SMAsolar\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mike\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/\",\"url\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/\",\"name\":\"SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.sma-sunny.com\/us\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg\",\"datePublished\":\"2020-08-18T02:17:59+00:00\",\"dateModified\":\"2020-12-08T15:02:18+00:00\",\"author\":{\"@id\":\"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/543704762da4978ac85cb412aca21b87\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage\",\"url\":\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg\",\"contentUrl\":\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg\",\"width\":600,\"height\":334,\"caption\":\"SMA Service Support\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/www.sma-sunny.com\/us\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMA Extends Smart Connected Registration Window to Two Years!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/#website\",\"url\":\"https:\/\/www.sma-sunny.com\/us\/\",\"name\":\"Sunny. SMA Corporate Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sma-sunny.com\/us\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/543704762da4978ac85cb412aca21b87\",\"name\":\"Mike\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2021\/03\/Mike-Mahon-120x120.jpg\",\"contentUrl\":\"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2021\/03\/Mike-Mahon-120x120.jpg\",\"caption\":\"Mike\"},\"description\":\"Senior Technical Trainer, Solar Academy, SMA America. Mike hosts webinars and in-person trainings on SMA America\u2019s string inverters, communication products and design tools.\",\"url\":\"https:\/\/www.sma-sunny.com\/us\/author\/mike\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/","og_locale":"en_US","og_type":"article","og_title":"SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog","og_description":"In response to strong customer enrollment, SMA has extended the window for customers to enroll their Sunny Portal plants into...","og_url":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/","og_site_name":"Sunny. SMA Corporate Blog","article_publisher":"https:\/\/facebook.com\/SMASolarTechnology","article_published_time":"2020-08-18T02:17:59+00:00","article_modified_time":"2020-12-08T15:02:18+00:00","og_image":[{"width":600,"height":334,"url":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg","type":"image\/jpeg"}],"author":"Mike","twitter_card":"summary_large_image","twitter_creator":"@SMAsolar","twitter_site":"@SMAsolar","twitter_misc":{"Written by":"Mike","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/","url":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/","name":"SMA Extends Smart Connected Registration Window to Two Years! - Sunny. SMA Corporate Blog","isPartOf":{"@id":"https:\/\/www.sma-sunny.com\/us\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage"},"image":{"@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage"},"thumbnailUrl":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg","datePublished":"2020-08-18T02:17:59+00:00","dateModified":"2020-12-08T15:02:18+00:00","author":{"@id":"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/543704762da4978ac85cb412aca21b87"},"breadcrumb":{"@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#primaryimage","url":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg","contentUrl":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2020\/10\/SMA-Smart-Connected-US_1920x676_DE_wPEAK3_GraySB-600px.jpg","width":600,"height":334,"caption":"SMA Service Support"},{"@type":"BreadcrumbList","@id":"https:\/\/www.sma-sunny.com\/us\/sma-extends-smart-connected-registration-window-to-two-years\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.sma-sunny.com\/us\/"},{"@type":"ListItem","position":2,"name":"SMA Extends Smart Connected Registration Window to Two Years!"}]},{"@type":"WebSite","@id":"https:\/\/www.sma-sunny.com\/us\/#website","url":"https:\/\/www.sma-sunny.com\/us\/","name":"Sunny. SMA Corporate Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sma-sunny.com\/us\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/543704762da4978ac85cb412aca21b87","name":"Mike","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sma-sunny.com\/us\/#\/schema\/person\/image\/","url":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2021\/03\/Mike-Mahon-120x120.jpg","contentUrl":"https:\/\/www.sma-sunny.com\/wp-content\/uploads\/2021\/03\/Mike-Mahon-120x120.jpg","caption":"Mike"},"description":"Senior Technical Trainer, Solar Academy, SMA America. Mike hosts webinars and in-person trainings on SMA America\u2019s string inverters, communication products and design tools.","url":"https:\/\/www.sma-sunny.com\/us\/author\/mike\/"}]}},"_links":{"self":[{"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/posts\/117489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/users\/100"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/comments?post=117489"}],"version-history":[{"count":0,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/posts\/117489\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/media\/117490"}],"wp:attachment":[{"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/media?parent=117489"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/categories?post=117489"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sma-sunny.com\/us\/wp-json\/wp\/v2\/tags?post=117489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}