Technical Documentation & Updates

Updated at July 20 , 2020

The purpose of this blog entry is to keep you informed about the latest updates and new publications for SMA devices released by the technical documentation team. This information will be made available regulary. This means that you will always be kept up to date and will never miss any changes or anything new that is published.

Latest Technical and Product Documentation

The following product-related documents have been updated and published for the first time and are available for download from the Download Area at www.SMA.de/en:

SUNNY HIGHPOWER PEAK1 – The Best of Two Worlds
Datasheet

MV Power Station 2200-S2 / 2475-S2 / 2900-S2 – Turnkey Solution for PV Power Plants and large-scale storage systems
Data sheet

MV Power Station 2660-S2 / 2800-S2 / 2930-S2 / 3060-S2 – Turnkey Solution for PV Power Plants and Large-Scale Storage Systems
Data sheet

MV Power Station 4000-S2 / 4200-S2 / 4400-S2 / 4600-S2 – Turnkey Solution for PV Power Plants and Large-Scale Storage Systems
Data sheet

SUNNY TRIPOWER 15000TL / 20000TL / 25000TLSUNNY TRIPOWER 15000TL / 20000TL / 25000TL
Operating Manual

SUNNY CENTRAL UP – The new Sunny Central: more power per cubic meter
Data sheet

Commissioning Report – Storage Package – Business
Operating Manual

SUNNY PORTAL powered by ennexOS
Operating Manual

SUNNY BOY 5.5-JP
Operating manual

Use of BYD Battery-Box Premium HVM with Sunny Boy Storage 3.7 / 5.0 / 6.0
Information on Commissioning

SUNNY CENTRAL STORAGE UP – Battery inverter for large-scale storage systems
Data sheet

SUNNY CENTRAL UP – The new Sunny Central: more power per cubic meter
Data sheet

SUNNY CENTRAL UP – The new Sunny Central: more power per cubic meter
Data sheet

SMA DATA MANAGER M
Operating manual

SUNNY BOY STORAGE 2.5
Operating manual

SUNNY BOY 3.0 / 3.6 / 4.0 / 5.0 / 6.0 (SB3.0-1AV-41 / SB3.6-1AV-41 / SB4.0-1AV-41 / SB5.0-1AV-41 / SB6.0-1AV-41)
Operating manual

SUNNY ISLAND 4.4M-13 / SI4.4M-12
Firmware update 3.20.09.R for all system configuration. This firmware is not needed for On-Grid systems which are commissioned before 27.04.2019 or for On-Grid Systems outside of EU, which are not affected by new RfG-Requirements. Please check the ReadMe file before start the update-process.

Sunny ISLAND 6.0H-13 / SI8.0H-13 / SI6.0H-12 / SI8.0H-12
Firmware update 3.20.09.R for all system configuration except On-Grid Multicluster-Systems. This firmware is not needed for On-Grid systems which are commissioned before 27.04.2019 or for On-Grid Systems outside of EU, which are not affected by new RfG-Requirements. Please check the ReadMe file before start the update-process.

SUNNY HIGHPOWER PEAK3
Firmware-Update Package 3.11.33.R – It is mandatory to take note of the ReadMe file before applying update / Bitte nehmen Sie die ReadMe zur Kenntnis bevor Sie das Update ausführen

SUNNY ISLAND 6.0H-13 / SI8.0H-13 / SI6.0H-12 / SI8.0H-12
This firmware can be used for On-Grid Multicluster-Systems and On-Grid systems which are commissioned before 27.04.2019 or for On-Grid Systems outside of EU, which are not affected by new RfG-Requirements. Please check the ReadMe file before start the update-process.

SUNNY CENTRAL 500CP XT / 630CP XT / 720CP XT / 760CP XT / 800CP XT / 850CP XT / 900CP XT / 1000CP XT
Maintenance Manual

SUNNY CENTRAL 500CP-JP / 630CP-JP / 800CP-JP / 1000CP-JP
Maintenance Manual

 

Links for more information

SMA Download Area

SMA FAQ & Support

SMA on Twitter

If you have further questions, please write an e-mail to SocialMedia@SMA.de.